Fig. 3
![Fig. 3](http://media.springernature.com/full/springer-static/image/art%3A10.1186%2Fs40696-016-0025-4/MediaObjects/40696_2016_25_Fig3_HTML.gif)
Phase 2 10-bed facility [Dental would be excluded as this is typically not part of Disaster Relief missions. Omitting Dental also drops the price of the package substantially such that the price of a 25 bed facility is the same as a 10 bed facility ($1.6 million)]